Free tool · ₹

Injection moulding part cost calculator.

Cost per piece and the price to quote, from the numbers you already know: part and runner weight, cavities, cycle, resin rate, machine hour rate, rejection and margin. Built for Indian floors — rupees, grams, kilograms.

Part and mould

g
g
Cold runner; 0 for hot runner
%

Rates

₹/kg
Blended, with masterbatch
s
₹/h
Work yours out →
₹/h
₹18,000 a month ≈ ₹90/h; halve it if one operator runs two presses
%
₹
%
%

Result

Fill in the part, the mould and your rates, then generate. You get:

  • Cost per piece and the price to quote
  • Per 1,000 pieces, good pieces an hour, resin per 1,000
  • The full breakdown, and a quote ready to send on WhatsApp

Quote from real numbers, not last year's.

Cystems reads your presses every minute — actual cycle, actual rejection, kWh per shot — and costs every job from what the floor did. Run this calculator on your own presses, live.

Get my plant simulated

How the cost per piece is worked out

Material = (part weight + runner weight × (1 − regrind) ÷ cavities) × resin ₹/kg. The runner is shared by every cavity, and the part of it you grind back and reuse costs nothing but the grinding.

Machine = machine hour rate × cycle ÷ 3600 ÷ cavities. One cycle makes one shot; one shot makes as many pieces as the mould has cavities running. Labour works the same way with the operator's hourly cost.

Rejection is applied to the three above: if 2% of pieces are scrapped, the good ones carry the cost of the bad, so cost ÷ (1 − 2%). Packing is added per piece, overhead as a percentage of the direct cost, and margin as a share of the selling price — so a 15% margin is price = cost ÷ 0.85, not cost × 1.15.

Typical figures on an Indian floor

InputWhere it usually lands
Resin, ₹/kgPP and HDPE ₹95–120, ABS ₹150–190, PA6 ₹220–280, PC ₹260–340 — check this month's circular
Machine hour rate₹250–350 for 80–120 T, ₹400–550 for 150–250 T, ₹700–1,000 for 350 T and up
Operator₹16,000–22,000 a month; often one operator to two presses
Rejection1–3% on a settled job; 5–10% on a new mould or a wet material
RegrindRunners reused at 30–100% for commodity parts; 0% where the customer forbids it

Where quotes go wrong

The runner is forgotten. On a small part, a 12 g cold runner across four cavities adds 3 g to a 38 g part: 8% of the material, straight off the margin.

The cycle is the setter's best, not the shift's average. A mould that runs 32 s at 10 a.m. and 36 s by the night shift costs 12% more machine time than quoted. Only the press knows the real number.

Rejection is left out because "we'll fix the mould". Put it in; take it out when the mould is actually fixed.

Margin is added as markup. 15% on cost is 13% of price; on a 500,000-piece order that gap is real money.

Cystems does this sum from the floor's own figures, per job, as it runs: how we read your presses.