Free tool · metric

Press tonnage & shot weight calculator.

Which press a part needs. Clamp force from the projected area and the material, rounded up to the press size you'd actually buy or book; then the shot weight, its polystyrene equivalent, and the barrel capacity the press should have.

Clamp force

cm²
The outline as the clamp sees it, not the surface area
cm²
0 for a hot runner
%

Shot weight

g
g

Result

Fill in the area, the material and the weights, then generate. You get:

  • The clamp force needed and the press size to pick
  • Shot weight and its polystyrene equivalent
  • The barrel capacity range, ready to send on WhatsApp

Cystems checks this for every job, before release.

Each mould carries its projected area and material; each press its clamp force and tie-bar gap. A job on the wrong press is refused before the setter wheels the mould over — on a floor that runs from 75 to 350 tonnes.

Get my plant simulated

How clamp force is worked out

Clamp force (t) = total projected area × material factor × (1 + safety). The projected area is the shadow of the parts and the runner on the parting line — cavities × part area + runner area. The factor is the clamping pressure the material needs, in tonnes per square inch of that shadow (1 in² = 6.45 cm²), and it rises with the material's viscosity and the injection pressure it needs.

MaterialFactor, t/in²Density, g/cm³
LDPE, TPE1.50.92 – 1.0
PP, HDPE, GPPS, HIPS2.00.91 – 1.05
ABS, PVC rigid, PP GF303.01.05 – 1.40
PA6, PA66, POM, PBT, PET, PMMA, PC/ABS3.51.14 – 1.41
PC4.01.20
PA66 GF304.51.37

The result is rounded up to the next standard press size — 80, 100, 120, 150, 180, 200, 250, 300, 350, 400, 450, 500, 650, 800, 1000 tonnes — because that is what sits on the floor.

Shot weight and the barrel

Shot weight = part weight × cavities + runner weight. Barrels are rated in polystyrene (density 1.05), so a shot of another material is converted: PS-equivalent = shot × 1.05 ÷ density. A press should use between 20% and 80% of its rated shot — below 20% the melt sits too long in the barrel and degrades, above 80% the screw cannot keep up and the cushion disappears. The sweet spot is about half.

Why the press matters for cost

A 350 T press running a job that needs 150 T costs roughly twice the hour rate for the same parts. On most Indian floors the biggest press is the busiest one, not because the jobs need it, but because nobody checked. Cystems keeps each mould's area and material on the mould record and each press's clamp force on the press, so the match is checked every time a job is planned.